Showing posts with label Railway Station. Show all posts
Showing posts with label Railway Station. Show all posts

Friday, December 10, 2010

Work begins on city's first metro

HA NOI — Construction has kicked off on Ha Noi's first light metro line.

The US$1billion line will run from Nhon in Tu Liem District to Ha Noi's Railway Station in Hoan Kiem District. The metro line is the largest public transportation project that the city has ever undertaken.

Prime Minister Nguyen Tan Dung highlighted the project's importance during a speech at the groundbreaking ceremony on Saturday. He said the new metro line would aid the capital city's construction and development, while increasing the city's public transportation capacity and easing traffic congestion in the inner city.

He also urged the municipal authorities to join with relevant agencies to expedite other public transport projects.

The 12.5km Nhon-Ha Noi Railway Station section is part of metro route No3, which will be 20km in length. The pilot is one of five metro lines approved by the Prime Minister as part of the city transportation development plan that will be completed by 2020. Ha Noi would develop three more light metro routes in the future, said Ha Noi People's Committee Chairman Nguyen The Thao.

Thao said upon its completion, the metro line, which is expected to carry 300,000 passengers a day, would improve the city's public transport capacity and ease the heavy traffic congestion in the city's western area.

Unlocking the gridlock

The rapid increase in the number of two-wheeled and four-wheeled vehicles have seriously hampered the city's transportation infrastructure.

Traffic jams are common in the city's inner district, especially in the East-West corridor linking Nhon to the city centre, reports Ha Noi Moi (new Ha Noi) newspaper.

A tunnel boring machine (TBM) will be used to build the line's tunnel, which will mitigate the impacts of the project's construction.

There will be 12 stations along the line. Each four-carriage metro is capable of serving more than 900 passengers and will be able to travel at a maximum speed of 80 km per hour. Total travel time is expected to take about 20 minutes.

The metro line is slated to be operational by late 2015 and will be built with consultancy services from France's Systra - International Consulting Engineers for Rail and Urban Transport. — VNS

Related Articles

Wednesday, October 20, 2010

Hanoi to start urban railway construction

railway

Construction will begin on Sept. 22 on a pilot urban railway, running from Nhon in Tu Liem District to Hanoi Railway Station, as part of a largest ever public transport project in Hanoi, said Head of the municipal People’s Committee’s Office Nguyen Thinh Thanh.

The municipal People’s Committee requested Tu Liem District to finalize preparations, especially site clearance for the project before Sept. 16.

Under the plan till 2020, Hanoi will have five urban railway routes, linking the inner city with nearby urban centers of Bac Ninh, Vinh Phuc, Hung Yen and Thai Nguyen.

The Nhon-Hanoi Railway Station, the third route of the plan, has a total length of 12 kilometers, connecting the city’s west part to the downtown and the southern part.

The first route will run between Ngoc Hoi, Yen Vien and Nhu Quynh. It will link areas located in the northeast and the south of Hanoi with downtown.

The second route, Noi Bai-downtown-Thuong Dinh, is the backbone of the urban area at the present and in the future. It will connect with the railway route from Cat Linh, Hanoi to Ba La, Ha Dong.

The fourth route will run between Dong Anh, Sai Dong, Vinh Tuy, Thanh Xuan, Tu Liem, Thuong Cat and Me Linh. This route will connect urban development projects.

The fifth route will run between the southern part of West Lake, Ngoc Khanh and Lang-Hoa Lac to connect the downtown with urban areas located along Lang-Hoa Lac corridor.

Related Articles

Tuesday, October 19, 2010

Hanoi to start urban railway construction

Construction will begin on Sept. 22 on a pilot urban railway, running
from Nhon in Tu Liem district to Hanoi Railway Station, as part of a
largest ever public transport project in Hanoi, said Head of the
municipal People’s Committee’s Office Nguyen Thinh Thanh.


The municipal People’s Committee requested Tu Liem district to finalise
preparations, especially site clearance for the project before Sept. 16.


Under
the plan till 2020, Hanoi will have five urban railway routes,
linking the inner city with nearby urban centres of Bac Ninh, Vinh Phuc,
Hung Yen and Thai Nguyen.


The Nhon-Hanoi Railway Station, the
third route of the plan, has a total length of 12km, connecting the
city’s west part to the downtown and the southern part.


The first
route will run between Ngoc Hoi, Yen Vien and Nhu Quynh. It will link
areas located in the northeast and the south of Hanoi with downtown.


The second route, Noi Bai-downtown-Thuong Dinh,
is the backbone of the urban area at the present and in the future. It
will connect with the railway route from Cat Linh, Hanoi to Ba La,
Ha Dong.


The fourth route will run between Dong
Anh, Sai Dong, Vinh Tuy, Thanh Xuan, Tu Liem, Thuong Cat and Me Linh.
This route will connect urban development projects.


The fifth route will run between the southern part of West Lake ,
Ngoc Khanh and Lang-Hoa Lac to connect the downtown with urban areas
located along Lang-Hoa Lac corridor./.

Related Articles